Resources — Page 7
Guides for cutting dies, laser-cut dies, carton dies, label cutting dies and BOBST tooling, including files, dimensions, materials and quote preparation.
No matching guide. Try a shorter term or reset the filters.
Latest guides
Sample checks for gasket and industrial part dies
For gasket and industrial part dies, sample checks protect dimensions, hole centers, material compression and repeat production quality.
How to manage die revisions on repeat orders
On repeat orders, die revisions should compare old files, new dimensions, material changes and production history before cutting.
How to choose rule height and steel rule type
Substrate thickness, cut depth, creasing requirements and press pressure all shape rule height and steel rule selection.
Creasing channel, board gsm and folding quality guide
Clean carton folding depends on crease line, channel width, board gsm and grain direction being reviewed together.
Crushing and folding problems in corrugated board dies
Corrugated die quality depends on flute type, press pressure, creasing choices and rubbering layout being evaluated together.
Liner, adhesive bleed and kiss-cut settings in label die cutting
Good label die cutting depends on the balance between face stock, adhesive, liner and blade pressure.
Waste, stripping and blanking control in die-cutting jobs
Well-planned stripping and blanking improves waste removal, reduces stops and produces cleaner stacks.
Technical drawing checklist for a calmer die quote
Clear dimensions, separated line types, revision notes and material information speed up quoting and reduce production risk.
Urgent die production and lead-time planning: what speeds up the process?
Urgent die work moves faster when file, material, quantity, deadline and approval flow are clear from the start.
Die maintenance, storage and reuse guide
Clean storage, moisture protection and pre-use checks help maintain cutting quality when a die is reused.
Key details for faster quoting
Creasing, perforation, rubbering, rule height, file format and delivery timing are easier to review when they are written clearly.










